View Single Post
Old 08-01-2008, 03:35 PM   #23
BrianD
Grizzled Veteran
 
Join Date: Jan 2005
Location: Appleton, WI
Quote:
Originally Posted by st.cronin View Post
I think it approaches .5, actually.

Our ultimate conclusion is the same, but I'd argue with this point. Here is my example.

If I make the first cut at 0.1, where can I make the second cut to not leave anything greater than 0.5? My second cut has to be between 0.5 and 0.6. In this instance, I've only got 10% of the total rod in which to make my second cut.

If I make the first cut at 0.001, I'll only have 0.1% of the remaining rod which won't make a SupeRod. As X approaches 0, the odds of a SupeRod approach 1.

As X approahces 0.5, the odds of a SupeRod approach 0.5.

Now wait, does that mean a 75% chance of not making a triangle?
BrianD is offline   Reply With Quote