View Single Post
Old 06-18-2012, 10:59 AM   #200
Autumn
Head Coach
 
Join Date: Feb 2003
Location: Bath, ME
So if the Chief Engineer works with an Engineer they can do 6 cycles of work on a conversion. Alternatively a Chief could supervise up to 5 cycles of work. An engineer could supervise up to four cycles of work. So supervising costs 6 total AP for a chief (chief + 5 workers), or 5 total for an engineer.

Chief+Engineer Convert = 6 cycles, 2 AP
Chief+5 person team = 5 cycles, 6 AP
Engineer+4 person team = 4 cycles, 5 AP

Chief+8 slave team = 4 cycles, 1 AP
Engineer+6 slave team = 3 cycles, 1 AP

We've got I think a chief and three engineers it seems having a chief and engineer work together is the best bang for the buck, but really cuts down on how many total workers we can mobilize.
Autumn is offline   Reply With Quote