View Single Post
Old 06-18-2012, 03:34 PM   #330
Autumn
Head Coach
 
Join Date: Feb 2003
Location: Bath, ME
I'm not sure we can knock out two 7 cycle jobs. If we split up the chief engineer and engineer they only do two each. Or I guess we could have the Chief E. do 2 cycles of work, the other Engineer lead a team of slaves for 3 cycles of work. That should do it.
Autumn is offline   Reply With Quote